12-Month Fire Safety Plan Review

As the New Year approaches, some building operators are considering reviewing and updating their fire safety plans. One of the most popular questions which arises is that if no changes have occurred in the building, why is it necessary to review to the fire safety plan. Although changes may not have been made to a building over time, the probability of amendments to the fire code is high.

Changes to the list of building emergency personnel, their phone numbers, and the list of persons requiring assistance certainly would be of concern as this information is critical. In light of this, the fire code states that all fire safety plans are to be reviewed at intervals of no greater than twelve months. Some advance preparation is required to comply. This may seem challenging when reviewing a fifty-page fire safety plan, let alone when attempting to update its contents in a timely fashion.

One of the first steps is to find the workable copy of the fire safety plan, whether in soft or hard copy form, and then to determine whether any date markings are present on the latest in-house revisions, or in the City stamped approval on the front cover of the fire safety plan. In most cases, the developer of the fire safety plan may be contacted to discuss any revisions which are to be made and to request a proposal of the associated cost to complete them. Being in possession of a soft copy version of the fire safety plan is of benefit as it allows for printing copies whenever needed or updating its contents accordingly. Updating the evacuation floor layout drawings can be a little more of a challenge as most people do not have access to a CAD program. However, in most cases, the drawings can be converted into PDF formats by the creators of the drawings. For extensive modifications to the evacuation drawings, such as fire alarm and sprinkler system retrofits or structural add-ons, a site assessment of the building may be warranted by the creator, followed by a re-submission to the City for re-examination and approval.

Our editors, associate writers and publishers would like to take this opportunity to say thank you to all our readers for your continued support throughout 2018. Keep your letters coming!


For up to date fire code alerts, subscribe to our monthly fire and life safety bulletin at www.firepoint.ca/free/subscription.html
This bulletin and its contents is Copyright 2014 Firepoint Inc.
All rights reserved. Any redistribution or reproduction of part or all of the contents in any form is prohibited other than local hard drive for your personal usage or for the purposes of non-commercial usage.
* You may not, except with Firepoint Inc's express written permission, distribute or commercially exploit the contents.
* You may not transmit or store any part of the contents on a website or transfer electronically into a retrieval system.

The material in this bulletin is an information source and distributed for convenience of reference only. The publishers, authors and advertisers disclaim all liability for loss of damage, which may result in consequences of actions taken by any person, agency, or company while using, acting or relying on information contained herein. The reproduction of bulletin in whole or in part, is prohibited except with the granted written permission from the publisher.


tell a friend |





Copyright © Firepoint Inc - All Rights Reserved
Contact Firepoint Inc.
27-180 Wilkinson Rd., Brampton, ON L6T4W8
Tel: (905) 874-9400 Fax: (905) 874-9479